Toggle navigation
Home
Publications
Publications
Authors
Institutions
Journals
Rankings
Authors
Institutions
Journals
About
FAQ
Links
Contacts
PT
Sign in
Article
Title:
Better Late Than Never, but Never Late Is Better: Risk Assessment of Nuclear Power Construction Projects
Authors:
Joana Portugal-Pereira
(
Imperial Col London
,
Federal U Rio de Janeiro
)
Paula Ferreira
(
U Minho
)
Jorge Cunha
(
U Minho
)
Alexandre Szklo
(
Federal U Rio de Janeiro
)
Roberto Schaeffer
(
Federal U Rio de Janeiro
)
Madalena Araujo
(
U Minho
)
Journal:
Energy Policy
Year:
2018
Volume:
120
Pages:
158-166
JEL codes:
L74 - Construction
O33 - Technological Change: Choices and Consequences; Diffusion Processes
Q42 - Alternative Energy Sources
DOI:
10.1016/j.enpol.2018.05.041
Back