Minimizing Total Earliness and Tardiness in a Nowait Flow Shop
20.02
Jeffrey Schaller,
Jorge Valente
International Journal of Production Economics,
vol. 224, 2020, p. .
An Evolutionary Model of Industry Dynamics and Firms` Institutional Behavior with Job Search, Bargaining and Matching
1.55
Sandra Tavares Silva,
Jorge Valente,
Aurora Teixeira
Journal Of Economic Interaction And Coordination,
vol. 7, 2012, p. 23-61.
Heuristics for the Early/Tardy Scheduling Problem with Release Dates
20.02
Jorge Valente,
Rui Santos Alves
International Journal of Production Economics,
vol. 106, 2007, p. 261-274.
Improving the Performance of the ATC Dispatch Rule by Using Workload Data to Determine the Lookahead Parameter Value
40.03
Jorge Valente
International Journal of Production Economics,
vol. 106, 2007, p. 563-573.